Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Soto-Ferrari, Miltona; * | Chams-Anturi, Odetteb
Affiliations: [a] Scott College of Business, Indiana State University, Terre Haute, IN, USA | [b] Department of Economic Science, Universidad de la Costa, Barranquilla, Colombia
Correspondence: [*] Corresponding author: Milton Soto-Ferrari, Scott College of Business, Indiana State University, 30N 7th St, Terre Haute, IN 47809, USA. Tel.: +1 812 2372276; E-mail: [email protected].
Abstract: BACKGROUND:The COVID-19 pandemic continues to endure in the construction industry. While many businesses worldwide have adapted to working from home or home-based offices, this is impractical in this sector as building activity is conducted on-site, which creates difficulties for employees in adapting to the post-pandemic setting. OBJECTIVE:This article analyzes how the pandemic has changed and affected construction firms’ human management control systems dimensions. We addressed, amidst the pandemic, how work is being performed and its effects on employees and businesses. METHODS:In this analytical research, we used chain referral sampling to perform an in-depth interview study with top administrators of different construction firms in Colombia, and we used inferential statistics for our data analysis. RESULTS:Results showed potential sources of low efficiency and minimal control of resources, including lack of communication with employees, lack of recognition systems, centralized decision-making, and disconnection between business objectives and financial requirements. CONCLUSIONS:Construction firms must ensure workers understand the project goals adequately and be empowered to make on-site decisions provided a training program is offered. Organizations ought to connect their strategic business goals with financial requirements; these must be regularly updated and modified as the economic and labor force scenario evolves.
Keywords: Human management control systems, COVID-19, construction industry, communication
DOI: 10.3233/HSM-230021
Journal: Human Systems Management, vol. 43, no. 3, pp. 307-324, 2024
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]