You are viewing a javascript disabled version of the site. Please enable Javascript for this site to function properly.
Go to headerGo to navigationGo to searchGo to contentsGo to footer
In content section. Select this link to jump to navigation

Analysis of mental workload of electrical power plant operators of control and operation centers

Abstract

Electrical systems can be categorized as critical systems where failure can result in significant financial loss, injury or threats to human life. The operators of the electric power control centers perform an activity in a specialized environment and have to carry it out by mobilizing knowledge and reasoning to which they have adequate training under the terms of the existing rules. To reach this there is a common mental request of personnel involved in these centers due the need to maintain attention, memory and reasoning request. In this sense, this study aims to evaluate the Mental Workload of technical workers of the Control Centers of Electrical Energy. It was undertaken a research on operators control centers of the electricity sector in Northeast Brazil. It was used for systematic observations, followed by interview and application of the instrument National Aeronautics and Space Administration Task Load Index known as NASA-TLX. As a result there will be subsidies for an assessment of mental workload of operators, and a contribution to improving the processes of managing the operation of electric utilities and the quality of workers.