You are viewing a javascript disabled version of the site. Please enable Javascript for this site to function properly.
Go to headerGo to navigationGo to searchGo to contentsGo to footer
In content section. Select this link to jump to navigation

Macroergonomic intervention for work design improvement and raw materials waste reduction in a small footwear components company in Rio Grande do Sul-Brazil

Abstract

This article presents a macroergonomic intervention carried out in a small footwear components company located in the state of Rio Grande do Sul, Brazil. The company's demand was related to the waste of the expensive raw-material (thermoplastic polyurethane or TPU) used to manufacture the components (high heels pegs). According to the managerial staff, the waste was workers responsibility due to the craft characteristic of the process. A participative method was used to evaluate the problems, propose and implement solutions, as well as evaluate their impact on the workers and the Company. Improvements in the work conditions resulted in increase of workers' satisfaction with the work and in 31.5% waste reduction.