Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Lin, Jhih-Tsonga; * | Chen, Yan-Chengb | Wu, Shih-Chieha | Hwang, Sheue-Lingc
Affiliations: [a] National Chung-Shan Institute of Science and Technology, Long-Tan District, Tao-Yuan City, Taiwan | [b] Taiwan Semiconductor Manufacturing Company Limited, HsinChu, Taiwan | [c] Department of Industrial Engineering and Engineering Management, National Tsing Hua University, Hsinchu, Taiwan
Correspondence: [*] Address for correspondence: Dr. Jhih-Tsong Lin, System Development Center, National Chung-Shan Institute of Science and Technology, Long-Tan District, Tao-Yuan City, Taiwan. Tel.: +886 3 4712201/Ext. 355276; E-mail: [email protected].
Abstract: BACKGROUND:In an advanced nuclear power plant (NPP), the operators are responsible for monitoring a massive number of alarm parameters. OBJECTIVE:To assist the operators, a monitoring-aid system (MAS), that applies four quality control chart methods, was proposed and evaluated. METHODS:Two types of MAS, namely, text and graph marks, were proposed and compared with the original display. To validate the proposed MAS, 17 professional engineers and operators were invited to join an experiment. Two different system states, normal and abnormal, were simulated. The operators were asked to manipulate the system, monitor the critical parameters, search for operational procedures, and deal with other secondary tasks. The primary and secondary task performance and heart rate were measured. After each task was conducted, three subjective rating questionnaires, namely, mental workload, situation awareness, and preference ratings, were implemented for the proposed MAS and the original system. RESULTS:With the assistance of the MAS, the alarm detection rate, secondary task performance, and subjective mental workload demonstrate significant improvements. The proposed MAS helps the operators monitor critical parameters. CONCLUSIONS:Therefore, the MAS should be considered for implementation with the control panel to increase the safety of NPPs. Furthermore, the MAS could reduce the mental workload might decrease the health hazard of the operators.
Keywords: Mental workload, situation awareness, control panel interface, quality control charts
DOI: 10.3233/WOR-172587
Journal: Work, vol. 57, no. 4, pp. 611-625, 2017
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]