Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Soltanzadeh, Ahmada | Mahdinia, Mohsena | Jafarinia, Ehsanb | Golmohammadpour, Hamedehc | Sadeghi-Yarandi, Mohsend; *
Affiliations: [a] Research Center for Environmental Pollutants, Department of Occupational Health and Safety Engineering, Faculty of Health, Qom University of Medical Sciences, Qom, Iran | [b] Department of Environmental Engineering, School of Engineering, Islamic Azad University, Tehran Central Branch, Tehran, Iran | [c] Department of Industrial Engineering, The State University of New York, University of Buffalo, Getzville, NY, USA | [d] Department of Occupational Health Engineering, School of Public Health, Tehran University of Medical Sciences, Tehran, Iran
Correspondence: [*] Address for correspondence: Mohsen Sadeghi-Yarandi, Department of Occupational Health Engineering, School of Public Health, Tehran University of Medical Sciences, Tehran, Iran. E-mails: [email protected], [email protected]. ORCID: 0000-0002-2512-8591.
Abstract: BACKGROUND:Construction projects are one of the most critical occupational sectors that experienced many challenges in occupational accidents and safety performance. OBJECTIVE:This study was designed to assess safety risk in construction projects based on fuzzy analytic hierarchy process. METHODS:This study was conducted with 12 construction and occupational safety experts in one of the largest construction projects in Tehran-Iran in 2020. The process of this study included (1) risk identification, (2) measurement of risk parameters and sub-parameters, and (3) risk assessment based on a fuzzy analytic hierarchy process. Risk-forming parameters in this study included the probability and severity of the event. The probability of occurrence was estimated based on four sub-parameters of technical inspection, accident experience, detection probability, and human reliability. Sub-parameters of severity included human injury, cost imposition, tarnishing the organization’s esteem, and impact on project timing and work stoppage. RESULTS:Twenty-eight identified hazards were examined in the studied construction project, including falling from a height (9-hazard), falling objects (2-hazard), electric shock (6-hazard), falling crane or load (6-hazard), elevator crashes (2-hazard), and soil fall (3-hazard). Safety risk assessment revealed that 27 risk sources were at the tolerable level and one risk source was unacceptable. CONCLUSION:This study demonstrated that the risk levels in the studied construction project were tolerable and unacceptable. The obtained model in this study demonstrated that using parameters that determine the probability and severity of risk according to the nature of the working environments can be a practical step in risk evaluating and implementing control measures.
Keywords: Construction project, safety, human injury, risk assessment, FAHP
DOI: 10.3233/WOR-220086
Journal: Work, vol. 76, no. 2, pp. 771-782, 2023
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]