Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Zhu, Wenxia; * | Zhang, Jinga | Zeng, Yinga; b | Chen, Jiec | Ma, Chongsena
Affiliations: [a] Changsha University of Science and Technology, School of Transportation Engineering, Changsha, China | [b] Guangdong Nengda Road Maintenance Co., LTD, Guangdong, China | [c] Hunan Modern Environment Technology Co., LTD, Changsha, China
Correspondence: [*] Corresponding author. Wenxi Zhu, Changsha University of Science and Technology, School of Transportation Engineering, Changsha 410114, China. Tel.: +0731-85258388; Fax: +0086 073185258375; E-mail: [email protected].
Abstract: This paper extracts the causes of collusion behavior based on literature analysis and expert interviews and obtains collusion causation data. The Apriori algorithm is used to mine the relationship between the causes of collusion behavior, and the network model of the causes of collusion behavior is constructed. The successive failures theory mines the most easily evolved causation chain of collusion behavior. The study results showed that: (1) The critical causes of the formation of collusion are self-discipline consciousness and difficulty of investigation. The strong control ability of causation network of collusion behavior is self-discipline consciousness, difficulty of investigation, and transparency of rights operation. (2) Based on the analysis of the group case data, eight causation chains are most likely to form collusion in actual cases, among which the causation chain of collusion behavior that occurs frequently is “difficulty of investigation⟶self-discipline consciousness⟶interest chain”. (3) In view of the causation nodes in the causation chain of collusion behavior, we propose more effective preventive and preventive control measures for collusion between bidders and tenderers in construction projects from three aspects, namely, behavior awareness binding, collusion implementation dilemma and collusion supervision deterrence.
Keywords: Construction project, collusive behavior, causation network, successive failures
DOI: 10.3233/JIFS-231802
Journal: Journal of Intelligent & Fuzzy Systems, vol. 45, no. 4, pp. 7047-7063, 2023
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]