Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Xu, Wenxianga | Wang, Leib; * | Liu, Dezhenga | Tang, Hongtaob | Li, Yibingb
Affiliations: [a] Hubei Longzhong Laboratory, Hubei University of Arts and Science, Xiangyang, Hubei, China | [b] School of Mechanical and Electronic Engineering, Wuhan University of Technology, Wuhan, Hubei, China
Correspondence: [*] Corresponding author. Lei Wang, School of Mechanical and Electronic Engineering, Wuhan University of Technology, Wuhan 430070, Hubei, China. E-mail: [email protected].
Abstract: Multi-agent collaborative manufacturing, high energy consumption and pollution, and frequent operation outsourcing are the three main characteristics of large complex equipment manufacturing enterprises. Therefore, the production scheduling problem of large complex equipment to be studied is a distributed flexible job shop scheduling problem involving operation outsourcing (Oos-DFJSP). Besides, the influences of each machine on carbon emission and job scheduling at different processing speeds are also involved in this research. Thus the Oos-DFJSP of large complex equipment consists of the following four sub-problems: determining the sequence of operations, assigning jobs to manufactories, assigning operations to machines and determining the processing speed of each machine. In the Oos-DFJSP, if a job is assigned to a manufactory of a group manufacturing enterprise, and the manufactory cannot complete some operations of the workpiece, then these operations will be assigned to other manufactories with related processing capabilities. Aiming at solving the problem, a multi-objective mathematical model including costs, makespan and carbon emission was established, in which energy consumption, power generation of waste heat and treatment capacity of pollutants were considered in the calculation of carbon emission. Then, a multi-objective improved hybrid genetic artificial bee colony algorithm was developed to address the above model. Finally, 45 groups of random comparison experiments were presented. Results indicate that the developed algorithm performs better than other multi-objective algorithms involved in the comparison experiments not only on quality of non-dominated solutions but also on Inverse Generational Distance and Error Ratio. That is, the proposed mathematical model and algorithm were proved to be an excellent method for solving the multi-objective Oos-DFJSP.
Keywords: Large complex equipment manufacturing, operation outsourcing, distributed flexible job shop scheduling, carbon emission, multi-objective improved hybrid genetic artificial bee colony algorithm
DOI: 10.3233/JIFS-223435
Journal: Journal of Intelligent & Fuzzy Systems, vol. 45, no. 1, pp. 147-175, 2023
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]