Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Jiang, Tianhuaa; * | Zhu, Huiqia | Deng, Guanlongb
Affiliations: [a] School of Transportation, Ludong University, Yantai, China | [b] School of Information and Electrical Engineering, Ludong University, Yantai, Shandong, China
Correspondence: [*] Corresponding author. Tianhua Jiang, School of Transportation, Ludong University, Yantai, China. E-mail: [email protected].
Abstract: The conventional production scheduling problem has mainly emphasized the time-related metrics, such as makespan, machine workload and tardiness/earliness, and so on. With the advent of the sustainable manufacturing, the green scheduling problem has been received more and more attention from scholars and researchers. In this paper, we investigate a green flexible job shop scheduling problem (GFJSP) with the consideration of environmental factors. To formulate the GFJSP problem, a mathematical model is first established to minimize the amount of total energy-consumption. To solve the model, a kind of improved African buffalo optimization (IABO) algorithm is proposed based on the characteristics of the problem. In the proposed IABO, a two-vector solution representation method is first designed, and a population initialization method is adopted to generate the initial solutions with certain quality and diversity. Based on the original ABO, several improvement strategies are introduced to enhance the performance of the algorithm, i.e., the modified individual learning mechanism and the aging-based re-initializaiton mechanism. In addition, in order to adapt our algorithm to the scheduling problem, a discrete individual updating method is developed to ensure the algorithm search directly in a discrete domain. Finally, a number of experiments have been conducted to test the performance of the proposed IABO algorithm. The simulation data demonstrate the effectiveness of the proposed IABO for the considered GFJSP.
Keywords: Green flexible job shop, improved African buffalo optimization, modified individual learning mechanism, aging-based re-initialization mechanism, discrete individual updating method
DOI: 10.3233/JIFS-191370
Journal: Journal of Intelligent & Fuzzy Systems, vol. 38, no. 4, pp. 4573-4589, 2020
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]