Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Birjandi, A.a | Mousavi, S. Meysamb; * | Hajirezaie, M.a | Vahdani, B.c
Affiliations: [a] Department of Industrial Engineering, South Tehran Branch, Islamic Azad University, Tehran, Iran | [b] Department of Industrial Engineering, Shahed University, Tehran, Iran | [c] Department of Industrial Engineering, Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran
Correspondence: [*] Corresponding author. S. Meysam Mousavi, Department of Industrial Engineering, Shahed University, Tehran, Iran. Tel.: +98 21 51212091; E-mail: [email protected].
Abstract: Multiple routes of networks in fuzzy environments are essential issues in the project scheduling problems (PSPs) with resource constraints, fuzzy RCPSP-MR. Route assignment to flexible work package defined in a project activity network indicates more complexities in front of canonical PSP. Also, in the last few decades, considering uncertainties’ concepts in project schedules have been essential and attracted the attention of researchers and project managers. Therefore, in this article, a new weighted mathematical model is presented under uncertainty conditions, and a new hybrid fuzzy approach is provided via two fuzzy primary methods. Then, a new four-part non-distinct (FPND) approach is proposed based on PSO, binary particle swarm optimization (BPSO) and genetic algorithm (GA) to minimize project end cost. In this approach as the first part and to generate high-quality primary routes for flexible work package, six different rules are investigated, and the appropriate route is chosen. In the second part, initial solutions are generated via PSO. Then, in the third part, initial solutions are improved based on GA. Finally, in the last part, assigned routes are improved with binary PSO. To appraise the effectiveness of the presented approach, influential parameters are tuned by Taguchi method. Finally, to evaluate the performance of FPND, 70 numerical examples are designed in different dimensions, and results are compared with other well-known algorithms.
Keywords: RCPSP-MR, fuzzy sets theory, multi-route work package, four-part non-distinct (FPND) approach, distribution rules, Taguchi method
DOI: 10.3233/JIFS-181293
Journal: Journal of Intelligent & Fuzzy Systems, vol. 37, no. 1, pp. 737-751, 2019
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]