Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Issue title: Special Section: Ambient advancements in intelligent computational sciences
Guest editors: Shailesh Tiwari, Munesh Trivedi and Mohan L. Kohle
Article type: Research Article
Authors: Bhuvanesh, A.a; * | Jaya Christa, S.T.b | Kannan, S.c | Karuppasamy Pandiyan, M.d | Gangatharan, K.e
Affiliations: [a] Department of Electrical and Electronics Engineering, PSN college of Engineering and Technology, Tirunelveli, Tamilnadu, India | [b] Department of Electrical and Electronics Engineering, Mepco Schlenk Engineering College, Sivakasi, Tamilnadu, India | [c] Department of Electrical and Electronics Engineering, Ramco Institute of Technology, Rajapalayam, Tamilnadu, India | [d] Department of Electrical and Electronics Engineering, Kalasalingam University, Krishnankoil, Tamilnadu, India | [e] Department of Mechanical Engineering, PSN College of Engineering and Technology, Tirunelveli, Tamilnadu, India
Correspondence: [*] Corresponding author. A. Bhuvanesh, Department of Electrical and Electronics Engineering, PSN college of Engineering and Technology, Tirunelveli, Tamilnadu, India. E-mail: [email protected].
Abstract: Generation Expansion Planning (GEP) aims to define the least cost capacity expansion plan to meet forecasted demand inward a pre-defined reliability criterion and emission constraint over a planning horizon. This paper presents the application of Differential Evolution (DE), Opposition-based Differential Evolution (ODE) and Self-adaptive Differential Evolution (SaDE) algorithms to GEP problem, where the power generating system of an Indian state Tamil Nadu is taken as study region. GEP problem has been solved for short-term (6-years) and long-term (12-years) planning horizon by considering least-cost, reliable supply and lowest emission to the environment using DE, ODE and SaDE also validated by Dynamic Programming (DP). GEP problem is solved for seven diverse cases such as, Case 1: Base case, Case 2: GEP with Energy Conservation (EC), Case 3: GEP with high penetration of Renewable Energy Sources (RES), Case 4: GEP with penalty costs on emissions from high emission plants (HEP), Case 5: GEP with energy storage technologies (EST), Case 6: Combination of Cases 2, 3&4 and Case 7: Combination of Cases 2, 3, 4&5. The results simultaneously provide the type and capacity of each power plant need to be expanded in each year of the planning horizon at least cost.
Keywords: DE, emission cost, GEP, ODE, RES, SaDE and Tamil Nadu electricity sector
DOI: 10.3233/JIFS-169681
Journal: Journal of Intelligent & Fuzzy Systems, vol. 35, no. 2, pp. 1387-1398, 2018
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]