Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Kundu, Aninditaa; * | Guchhait, Parthab | Panigrahi, Goutama | Maiti, Manoranjanb
Affiliations: [a] Department of Mathematics, NIT, Mahatma Gandhi Avenue, Durgapur, West Bengal, India | [b] Department of Mathematics, Vidyasagar University, Midnapore, Paschim-Medinipur, West Bengal, India
Correspondence: [*] Corresponding author. Anindita Kundu, Department of Mathematics, NIT, Mahatma Gandhi Avenue, Durgapur-713 209, West Bengal, India. Tel.: +91 9434416180; E-mail: [email protected].
Abstract: In this paper, a multi-item economic production quantity (EPQ) model for deteriorating seasonal products is developed with stock and promotional effort dependent demand in an imperfect production process. The promotional efforts are advertising, delivery facilities, better services, etc. The production process produces some imperfect quality units which are instantly reworked at a cost to bring back its quality to the perfect ones. Here, the rate of production is time dependent. Unit production cost is a function of production rate including the defective ones and the deterioration rate is considered as constant. The model is formulated as a profit maximization problem with space and budget constraints in the form of an optimal control problem. The total profit function with the effect of inflation and time-value of money is expressed as a finite integral over a finite planning horizon. The problem is solved using variational calculus to determine the minimum defective rates of the production process for which the total profit is maximum. Another three models are developed considering the constraints as uncertain (fuzzy, random and rough) in nature. For fuzzy model, three types of fuzzy numbers are considered. To deal with the fuzzy constraints, fuzzy possibility measure is used. Also, stochastic and rough constraints are reduced to the approximate crisp ones following chance constrained approach and rough expectation respectively. Numerical experiments are performed to illustrate the models. Also, some sensitivity analyses are performed and presented.
Keywords: Economic production quantity, imperfect production process, time-dependent demand, euler-lagrange function, defective rate, promotional effort
DOI: 10.3233/JIFS-16875
Journal: Journal of Intelligent & Fuzzy Systems, vol. 33, no. 1, pp. 649-666, 2017
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]