Affiliations: Kadir Has University, Faculty of Engineering, Department of Industrial Engineering, Cibali Merkez Campus, 34230 Cibali, Istanbul, Turkey | Istanbul Kültür University, Faculty of Engineering and Architecture, Department of Industrial Engineering, Atakoy Campus, D-100 Yanyol, Bakirkoy, Istanbul, Turkey
Note: [] Corresponding author. Tel.: +90 212 5336532; E-mail: [email protected]
Abstract: In mass production, assembly-line balancing (ALB) problem has been a critical and repetitive issue for companies for long time. On the other hand, equipment selection for stations has also been another important problem at the design stage of an assembly-line system. In this paper, both problems are handled simultaneously. Therefore first, goal programming (GP) method, a well-suited technique is used to develop a preemptive formulation to joint both of the problems, when the nature of the problem consists of several conflicting objectives, and some mathematical constraints on solutions. Second, an AHP method based on fuzzy scales which is incorporated with the GP is also used due to the fact that it takes both qualitative and quantitative judgments of decision-maker(s) into consideration to rank the equipment alternatives for stations by weight. The fuzzy AHP as one of the most commonly used multiple-criteria decision making (MCDM) methods has been effectively used for more than decade in both academic research and practice, and takes the vagueness and uncertainty on judgments of decision-maker(s) into consideration due to the fact that the crisp pairwise comparison in the conventional AHP seems to insufficient and imprecise to capture the right judgments of decision-maker(s). In short, in this study, a combined fuzzy AHP-GP approach is proposed to evaluating assembly-line design alternatives with equipment selection. An integer GP formulation is constructed, which also uses the fuzzy AHP scores of equipment alternatives, and employs them as one of the goals. Then, the mathematical model is solved to find out the ultimate alternative in terms of the minimized equipment cost and the maximized preference measures of decision-maker(s). The proposed approach is also illustrated on a sample case study.
Keywords: Fuzzy logic, analytic hierarchy process (AHP), goal programming (GP), assembly line design (ALD), assembly-line balancing (ALB)
Journal: Journal of Intelligent & Fuzzy Systems, vol. 18, no. 4, pp. 345-362, 2007
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]