Article type: Research Article
Authors: Daly, Gavina; * | Zoli, Tedb | Stoyanoff, Stoyanc
Affiliations: [a] McLaren Engineering Group, New York, NY, USA | [b] HNTB, New York, NY, USA | [c] RWDI, Bromont, QC, Canada
Correspondence: [*] Corresponding author. Gavin Daly, McLaren Engineering Group, New York, NY, USA. E-mail: [email protected].
Abstract: The Bronx-Whitestone Bridge was designed during the 1930s in an era of suspension bridges with decks stiffened by shallow plate girders, many of which were subsequently found to be vulnerable to aerodynamic instabilities such as vortex shedding and flutter. Following the occurrence of mild and benign wind-induced oscillations in the first several years after opening in 1939, the bridge has undergone a series of retrofits, from structural solutions such as stay cables, stiffening trusses, and a steel orthotropic deck, to aerodynamic enhancements such as a tuned mass damper and wind fairings. Wind tunnel studies in 2015 confirmed the improved aerodynamic performance due to the recently installed wind fairing system and stiffer orthotropic deck. A subsequent rehabilitation project gave the opportunity to assess measures to further improve the aerodynamic performance of the bridge. A 3 ft (0.91 m) tall solid screen added on top of the median barrier was found to act as an above-deck vertical baffle plate, disrupting the alternating pattern of vortices, reducing the susceptibility of the bridge to instabilities. This led to the conceptual design of a Median Barrier Extension (MBE) comprised of 3 ft (0.91 m) solid transparent acrylic panels fixed to the top of the existing median barrier posts, supported by a tubular steel frame. To ensure this unique barrier modification met current industry safety standards, the MBE design was iterated through a crash analysis study using non-linear finite element models before the final design proceeded to a full-scale physical crash testing program to MASH Test Level 4. This paper presents the full timeline of this innovative retrofit project, from conception during wind tunnel testing, through to design, crashworthiness studies and final construction in 2020. This project has demonstrated that a vertical extension to a median barrier can act as a simple and cost-effective enhancement to the aerodynamic performance of existing bridges.
Keywords: Long span bridges, aerodynamics, flutter, barrier, retrofit, vortex-induced oscillation, cable-supported, suspension, crashworthiness, wind tunnel
DOI: 10.3233/BRS-230216
Journal: Bridge Structures, vol. 19, no. 4, pp. 135-148, 2023
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]