Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Bi, Dongxuana; b | Zhao, Zizhena; b; | Zhang, Minga; b; | Li, Menglia; b | Su, Yancaia; b
Affiliations: [a] School of Mechanical Engineering, Qilu University of Technology (Shandong Academy of Sciences), Jinan, China | [b] Shandong Institute of Mechanical Design and Research, Jinan, China
Correspondence: [*] Corresponding authors: Zizhen Zhao, School of Mechanical Engineering, Qilu University of Technology (Shandong Academy of Sciences), Jinan, China and Shandong Institute of Mechanical Design and Research, Jinan, China. Tel.: +86 18753115863; E-mail: [email protected]. Ming Zhang, School of Mechanical Engineering, Qilu University of Technology (Shandong Academy of Sciences), Jinan, China and Shandong Institute of Mechanical Design and Research, Jinan, China. Tel.: +86 13853157623; E-mail: [email protected]
Abstract: BACKGROUND:The feed pipeline made from 30408 stainless steel of a new unit leaked during the air pressure test. OBJECTIVE:The present work aims to examine the specific cause of pipeline cracking, and providing effective approaches to avoid similar failures. METHODS:Macroscopic inspections of the cracked pipe defects were made on site immediately after leakage. Mechanical properties and hardness of specimens machined from the failed pipe were tested. In addition, microscopic analyses including material composition, microstructure observation and crack morphologies of the failed part were performed to get detail information. Composition of the feed raw material was also analyzed to identify whether it had been contaminated by corrosive elements or not. RESULTS:No impurity composition was found in the feed raw material. The element constituents, yield strength, tensile strength and hardness of the cracked pipe fulfill standard requirements. A number of scratches and defects with a size of several microns were found on the inner wall of the leaked pipe, and they were believed to be formed at the perforation step during pipeline processing. Liquation cracks were found at the pipeline butt weld joint, and they laid hidden dangers for the safety and steady operation of the pipeline. CONCLUSION:The overall analysis results indicated the pipeline leakage during air pressure test was caused by cracks initiated around inner wall defects, which sabotaged the bearing capacity of the pipe by wall thickness reduction and stress concentration. Therefore, improving the inner wall surface quality at the perforation step may help to avoid such failure. The metallurgical effect and weld stress caused during the welding process promoted the initiation and propagation of liquation cracks. The tendency of welding hot crack formation could be reduced by taking strict composition control of the welding rod and adopting reasonable welding parameters.
Keywords: 30408 Stainless steel, pipe cracking, local thinning, liquation crack, failure analysis
DOI: 10.3233/SFC-230018
Journal: Strength, Fracture and Complexity, vol. 17, no. 1, pp. 11-25, 2024
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]