Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Issue title: Negotiation and Scheduling Mechanisms for Multiagent Systems
Guest editors: Kwang Mong Simx, Minjie Zhangy and Takayuki Itoz
Article type: Research Article
Authors: Tsang, Edward P.K.a; * | Gosling, Tima | Virginas, Botondb | Voudouris, Chrisb | Owusu, Gilbertb | Liu, W.a
Affiliations: [a] Department of Computer Science, University of Essex, Colchester, UK | [b] BT Research Laboratories, Ipswich, UK | [x] Hong Kong Baptist University, Kowloon, Hong Kong, China | [y] University of Wollongong, Wollongong, NSW 2522, Australia | [z] Nagoya Institute of Technology, Gokiso, Showa, Nagoya 466-8555, Japan
Correspondence: [*] Corresponding author: Department of Computer Science, University of Essex, Wivenhoe Park, Colchester, C04 35Q, UK
Abstract: This paper is about business modelling and negotiation protocol design in distributed scheduling, where individual agents have individual (potentially conflicting) interests. It is motivated by BT's workforce scheduling problem, in which multiple service providers have to serve multiple service buyers. The service providers and buyers all attempt to maximize their own utility. The overall problem is a multi-objective optimization problem; for example, one has to maximize completion rates and service quality and minimize travelling distances. Although the work is motivated by BT's business operations, the aim is to develop a general negotiation protocol for staff empowerment. Standard contract net is a practical strategy in distributed scheduling where agents may have conflicting objectives. In this paper, we have introduced a retractable contract net protocol, RECONNET, which supports hill-climbing in the space of schedules. It is built upon a job-release and compensation mechanism. A system based on RECONNET has been implemented for BT's workforce scheduling problem. The software, which we call ASMCR, allows the management to exert full control over the company's multiple objectives. The manager generates a Pareto set of solutions by defining, for each buyer and seller, the weights given to each objective. ASMCR gives service buyers and sellers ownership of their problem and freedom to maximize their performance under the criteria defined by the management. ASMCR was tested on real-sized problems and demonstrated to meet BT's operational time requirement. It has full potential to be further developed for tackling BT's workforce scheduling problem.
Keywords: Management, negotiation protocols, computational mechanism design, modelling, multi-objective optimization
DOI: 10.3233/MGS-2008-4103
Journal: Multiagent and Grid Systems, vol. 4, no. 1, pp. 25-44, 2008
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]