Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Issue title: FUZZYSS'2011: 2nd International Fuzzy Systems Symposium
Article type: Research Article
Authors: Subulan, Kemal | Taşan, A. Serdar | Baykasoğlu, Adil
Affiliations: Faculty of Engineering, Department of Industrial Engineering, Dokuz Eylül University, Buca, İzmir, Turkey
Note: [] Corresponding author. Kemal Subulan, Faculty of Engineering, Department of Industrial Engineering, Dokuz Eylül University, Buca, İzmir, Turkey. Tel.: +90 2323017624; Fax: +90 2323017608; E-mail: [email protected]
Abstract: Nowadays, there has been a growing interest in reverse logistics, recycling, remanufacturing and reusing due to the environmental, economical issues and legal obligations. Due to this fact, companies should take into account the remanufacturing option while preparing the medium term planning (MTP) activities instead of using traditional production planning models. There are lots of studies in the literature related to the reverse logistics (RL) and closed-loop supply chain (CLSC) network design problem which takes place in strategic planning level but a few of them handles the medium-term planning activities. Thus, a fuzzy mixed integer programming model for medium-term planning in a CLSC related to a conceptual product with remanufacturing option is developed in this paper. In the proposed model, both forward and reverse flows are included and two production alternatives are considered: either “production of new products directly in manufacturing plants” or “bringing the returned products back to ‘as new condition’ in the remanufacturing facilities”. However, real world closed-loop supply chains are surrounded with uncertainty. Thus, storage capacities, retailers' and wholesalers' demands, return rates, acceptance ratios, weekly available production/remanufacturing times, transportation upper bounds and objective function value are considered as fuzzy in the proposed model. The proposed fuzzy mathematical programming model is converted into a crisp equivalent model by utilizing several fuzzy aggregation procedures from the literature. The proposed model is applied to an illustrative case and scenario analysis is also carried out for evaluating the effects of some parameters related to the concerned collection-recovery system. Solution of the proposed model is achieved by using ILOG OPL Studio 6.3.
Keywords: Tactical planning, closed-loop supply chains, remanufacturing, fuzzy mathematical programming
DOI: 10.3233/IFS-2012-0525
Journal: Journal of Intelligent & Fuzzy Systems, vol. 23, no. 6, pp. 345-368, 2012
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]