Article type: Research Article
Authors: Yang, Jun | Qiao, Linke; * | Li, Changjiang | Wu, Xing
Affiliations: State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining & Technology (Beijing), Beijing, China
Correspondence: [*] Corresponding author. Linke Qiao, State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining & Technology, Beijing, Beijing 100083, China. E-mail: [email protected].
Abstract: Roof collapse is the most frequent production accident in the mine production process, which seriously threatens the efficient and safe production of the mine. Therefore, it is urgent to carry out practical research on the roof collapse tendency of the roadway. After searching and analyzing the relevant documents, the primary influencing factors of roof collapse risk based on AHP are determined, namely engineering geology, rock mass support, construction management and natural environment. After refining the main influencing factors, the evaluation factor set is obtained, the fuzzy comprehensive evaluation relationship matrix is established, and the fuzzy comprehensive evaluation model of roof collapse risk is obtained. Finally, the quantitative evaluation of no collapse risk, weak collapse risk, medium collapse risk and high collapse risk is carried out. Taking a metal mine as an example, the risk of roof collapse of its C11 haulage roadway is selected for fuzzy evaluation. The evaluation result is high collapse risk, which is consistent with the evaluation result of the current specification, indicating that the model can be used for mine roof collapse risk evaluation. This method of estimating roof collapse has been applied on-site, which is consistent with the actual situation and has achieved good results. It has guiding significance for predicting the stability of tunnels and supporting operations.
Keywords: Analytic hierarchy process, risk assessment, roof collapse, fuzzy theory
DOI: 10.3233/JIFS-224146
Journal: Journal of Intelligent & Fuzzy Systems, vol. 45, no. 2, pp. 2753-2762, 2023
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]