Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Deng, Min-Huia; b | Zhou, Xiao-Yub | Wang, Jian-Qiangc; b | Li, Jun-Boa; * | Cheng, Peng-Feic; *
Affiliations: [a] School of Business, Guilin University of Technology, Guilin, PR China | [b] School of Business, Central South University, Changsha, PR China | [c] Hunan Engineering Research Center for Intelligent Decision Making and Big Data on Industrial Development, Hunan University of Science and Technology, Xiangtan, China
Correspondence: [*] Corresponding author. Jun-bo Li, School of Business, Guilin University of Technology, Guilin 541004, PR China. E-mail: [email protected] (J. Li); Peng-Fei Cheng, Hunan Engineering Research Center for Intelligent Decision Making and Big Data on Industrial Development, Hunan University of Science and Technology, Xiangtan 411201, China. E-mail: [email protected] (P. Cheng).
Abstract: The development of new energy industry is a pressing issue due to the deterioration of the environment. The selection of new energy projects is a critical problem for decision makers. Incomplete and uncertain information appears in the process of new energy project selection. Compared with other linguistic expressions, probabilistic linguistic term set (PLTS) simultaneously reflects all possible linguistic terms and their corresponding weights, which conforms to the cognitive habits of people. Thus, a multi-criteria decision-making framework under PLTS environment is constructed for energy project selection. Firstly, a normalised projection model of PLTS, which considers the distance and the angle between two objects, is proposed to overcome the limitations of distance measurement. Secondly, a comprehensive weight-determination method combining the maximum deviation and expert scoring methods is developed to calculate the weight vector of the criteria. Furthermore, a projection-based VIKOR (Višekriterijumska optimizacija i kompromisno rešenje) method is established to select new energy projects, which can reflect the preferences of decision makers for group utility and individual regret. Finally, a numerical study on new energy project selection is performed to determine the validity and applicability of this method. Sensitive and comparative analyses are also conducted to reflect the rationality and feasibility of the method.
Keywords: Multi-criteria decision-making, probabilistic linguistic term set, projection measurement, VIKOR method, new energy project selection
DOI: 10.3233/JIFS-210573
Journal: Journal of Intelligent & Fuzzy Systems, vol. 41, no. 1, pp. 1821-1836, 2021
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]