Article type: Research Article
Authors: Karimi, Saeed; * | Mirzamohammadi, Saeed | Pishvaee, MirSaman
Affiliations: Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
Correspondence: [*] Corresponding author. Saeed Karimi, Tel.: +989128944076; E-mail: [email protected].
Abstract: As a major concern of chief managers in each organization, project portfolio selection has a special place in their responsibilities. To assist managers in making decisions, applicable optimization models play an essential role in such processes. In this regard, this paper provides a stochastic optimization model for a project portfolio selection problem under different scenarios. Providing the novelty in the model along with making it closer to reality, the interdependency between revenue and cost of projects is considered. Due to the inherent uncertainty of parameters, the revenue and cost of each project, as well as contributed capital, follow triangular fuzzy parameters. Contrary to the previous model, the appreciation of assets is considered in the proposed model as the other novelty of the proposed model. To tackle the uncertainty of parameters, a robust possibilistic approach is used, which has been first-ever devised in such problems. Being both optimistic and pessimistic approaches available for decision-makers, a new measure is introduced to make the model inclusive. Moreover, by considering the confidence level as both parameter and decision variables, the robust possibilistic programming approach is adopted to solve the proposed model. Using the new proposed measure, the optimal average value of robust model are obtained under different confidence level. Finally, solving the optimization model, the results are provided by implementing the realization for uncertain parameters, and regarding the obtained results, discussions are made to provide some insights to the managers.
Keywords: Project portfolio selection, project interdependencies, possibilistic robustness, fuzzy uncertainty
DOI: 10.3233/JIFS-210144
Journal: Journal of Intelligent & Fuzzy Systems, vol. 42, no. 4, pp. 4191-4204, 2022
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]