Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Lina, Wanga | Zeshui, Xua; b; *
Affiliations: [a] School of Economics and Management, Southeast University, Nanjing, Jiangsu, China | [b] School of Business, Sichuan University, Chengdu, Sichuan, China
Correspondence: [*] Corresponding author. Xu Zeshui, E-mail: [email protected].
Abstract: Risk management is a significant part of the success of a public-private partnership (PPP) project. There are four phrases for the process of risk management: Constructing a risk management environment, identifying risk factors, evaluating risk factors, and allocating risk factors. After identifying risk factors, it is imperative to analyze and evaluate critical risk factors, which can help participants formulate strategies to allocate risk factors, and thus alleviate the possible adverse results. The objectives of analyzing and evaluating risk factors focus on two aspects: The possibilities of risk occurrence and the degrees of risk loss. On behalf of determining the critical risk factors effectively, we take the probability degree and linguistic expressions into consideration to manifest experts’ perspectives. We consider critical risk factors in terms of the probabilistic linguistic terms with weakened hedges from the evidential reasoning approach view. The linguistic terms with weakened hedges are applied to express the degree of risk risk loss, and the possibilities of risk occurrence collect from the probabilities of linguistic terms with weakened hedges. First, the commonality function and plausibility function are applied to correct the possibilities of risk occurrence for linguistic terms with weakened hedges. Next, we build a risk evaluation model from experts’ risk propensity and risk perceptions. Moreover, a case study of the risk analyzing and evaluating process of a PPP project is applied to illustrate the availability and effectiveness of the proposed model. We contrast the introduced model with other approaches. Finally, the advantages of this model intend to improve the linguistic terms with weakened hedges for the probabilistic linguistic terms with weakened hedges and evaluate risk factors considering the evidence reasoning approach.
Keywords: Risk evaluation, Probabilistic linguistic terms with weakened hedges, Evidential reasoning theory, Public-private partnership project
DOI: 10.3233/JIFS-210101
Journal: Journal of Intelligent & Fuzzy Systems, vol. 41, no. 1, pp. 1173-1191, 2021
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]