Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Moradi, Mojtaba | Hafezalkotob, Ashkan; * | Ghezavati, Vahidreza
Affiliations: College of Industrial Engineering, South Tehran Branch, Islamic Azad University, Entezari Aly, Oskoui st, Choobi Brg, Tehran, Iran
Correspondence: [*] Corresponding author. Ashkan Hafezalkotob, College of Industrial Engineering, South Tehran Branch, Islamic Azad University, Entezari Aly, Oskoui st, Choobi Brg, Tehran, Iran. Tel.: +98 912 778 5681; E-mail: [email protected].
Abstract: Sustainability is one of the most significant problems in today’s world and the concept of sustainable development is being an important objective in construction projects. Since the large projects have enormous and different activities that should be scheduled by considering resource constraint and precedence relationship between them, the resource-constrained project scheduling problem (RCPSP) is a NP-hard problem. In this study, fuzzy project scheduling model is presented to solve RCPSP under uncertainty in availability of the resources and activities duration simultaneously. Subcontractors have incentive to share their resources in the form of coalition in order to reduce activities time and cost. In this research, cooperative game methods are introduced for fair allocating utility of the project, as well as, present supper-additivity, stability and satisfaction level of each coalition. Finally, sustainability concept is analyzed in RCPSP and cooperation of subcontractors in a coalition form, whereas in the previous researches these topics addressed separately or generally in project scheduling to minimize the makespan and maximize the profit of project. The results of the proposed model indicate that the subcontractors can obtain more profit and the balance between sustainability indicators in project management arises by collaboration.
Keywords: Sustainability, fuzzy project scheduling, RCPSP, cooperative game theory, satisfaction level
DOI: 10.3233/JIFS-171821
Journal: Journal of Intelligent & Fuzzy Systems, vol. 35, no. 6, pp. 6255-6267, 2018
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]