Article type: Research Article
Authors: Sennah, Khaleda | Afefy, Hamdy M.a; b; *
Affiliations: [a] Civil Engineering Department, Ryerson University, Toronto, ON, Canada | [b] Structural Engineering Department, Faculty of Engineering, Tanta University, Tanta, Egypt
Correspondence: [*] Corresponding author: Hamdy M. Afefy, Structural Engineering Dept., Faculty of Engineering, Tanta University, Tanta, Egypt.Tel.: +20 106 177 3174; Fax: +20 342 98793; [email protected]
Abstract: Speed of construction, particularly for bridge replacement and repair projects, has become a critical issue to minimize disruption of traffic and commerce. A promising system for rapid construction is a precast bridge system using decked bulb tee prestressed concrete girders. This type of bridge includes manufacturing the bridge deck precast and pretensioned with the girder in the precast plant under controlled environment. Then, the precast girders are transported to the construction site, and placed over the abutments and piers beside each other with flanges of adjacent girders field connected. Load transfer between adjacent girders is provided by longitudinal joints parallel to traffic direction. This paper presents a new bridge deck slab flange-to-flange connection system for precast Deck Bulb Tee (DBT) girders. The objectives of this study were to develop moment-transferred and intermittent-bolted connections for DBT bridge girders in view of the ultimate strength of the connection system. Two types of moment-transferring connection and two types of intermittent-bolted connection were developed. The paper presents design procedure of the developed joints based on available design equations in North American design codes for bridges and structures as well as related design equations available in the literature. The developed joint was considered successful if the theoretical resistance satisfied the requirements specified in North American Bridge Codes. Comparison between the theoretical findings and the available experimental failure loaded of actual-size bridge deck specimens simulating the developed connection justified the proposed theoretical design procedure.
Keywords: Design codes bridges, prefabrication, connections, bolted, experimental data, bridge decks, accelerated bridge construction
DOI: 10.3233/BRS-150087
Journal: Bridge Structures, vol. 11, no. 1-2, pp. 33-53, 2015
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]